Elisen participated in the development of the Bombardier Global 7000 business aircraft and assisted the OEM and Tier 1 supplier in the design and validation effort.

Work Package definition:

  • Forward Fuselage transition section (section between cockpit and constant section fuselage)
  • Main Entrance door
  • Cabin Floor
  • Fuselage interface connections
  • Systems routing and provisions

Responsibilities:

  • On-site integrated team (>60,000 mhrs)
  • Resource management accountability
  • Structural design and substantiation
  • Systems integration and installation validation
Rectangle 20