Elisen participated in the development of the A220 (Bombardier CSeries) and assisted the OEM in the design and validation effort.
Work Package definition:
Center Fuselage Section consisting of:
- Cabin section
- Floor structure
- Wing interface.
Responsibilities:
- On-site integrated team (>250,000 mhrs)
- Technical and resources management accountability
- Structural design and substantiation
- Systems integration and installation validation
- Ground testing definition and correlation