Elisen participated in the development of the A220 (Bombardier CSeries) and assisted the OEM in the design and validation effort.

Work Package definition:
Center Fuselage Section consisting of:

  • Cabin section
  • Floor structure
  • Wing interface.

Responsibilities:

  • On-site integrated team (>250,000 mhrs)
  • Technical and resources management accountability
  • Structural design and substantiation
  • Systems integration and installation validation
  • Ground testing definition and correlation